Work Experience

Quality Coordinator (Bird Construction)
May 2025 - August 2025
  • Wrote site procedure outlining the formal Notification of Inspection process
  • Inspected heavy civil and industrial piping work in accordance to CSA A23.1-19 and ASME B31.3 Standards
  • Modeled concrete strength curves to predict pour strength at specified curing time intervals
  • Drafted weld map drawings for temporary and permanent HDPE piping lines in accordance with P&ID drawings
Skilled Labourer (Stuart Olson)
June 2023 - August 2023
  • Directed unloading of telehandler moving materials between ground level and higher floors
  • Performed rough carpentry work, such as cutting wall backing and protecting finishing work with plywood installations
  • Led temporary workers on site cleanups, organizing materials and clearing areas under active work
Sales Associate (Celebration Party Rentals)
June 2022 - September 2022
  • Communicated with customers to place orders and recorded information into back-end system
  • Secured and delivered products/equipment ordered by customers
  • Maintained equipment and washed dishes upon return from a customer
  • Recorded accurate inventory logs and ensured accurate tracking of rented items
Labourer (Bird Construction)
June 2021 - August 2021
  • Demolished walls and concrete flooring using power tools to make space for renovations
  • Prepared site and cut foam to level ground for concrete pours

Design Teams

Marine Robotics (Torpedo, Structure)
September 2024 - Present
  • Implemented launching mechanism to propel neutrally buoyant torpedoes along a straight 1m trajectory
  • Evaluated materials and manufacturing processes to design a cost-effective and manufacturable AUV structure
  • Designed spool to adjust tether length during remote controlled testing
OK Motorsports (Powertrain)
September 2024 - Present
  • Designed dry sump oil pan for new oil system, for lowering vehicles center of gravity
  • Optimized rear sprocket for Mk.4 ICE vehicle to be lighter and improve gearing with new design made of 7075 Aluminum
  • Validated structural parts using FEA to minimize weight while maintaining a minimum safety factor of 1.5 for operation